|
|image = Xiaobitan-Station.JPG |caption = Xiaobitan Station Concourse |type = Rapid transit |locale = Taipei, Republic of China |start = Qizhang |end = Xiaobitan |stations = 2 |open = September 29, 2004 |operator = Taipei Rapid Transit System |character = Elevated and Underground |depot = Xindian Depot |stock = Kawasaki C371 3 cars per set, 1 set per train |linelength = |notrack = 2 |gauge = |speed = 80 km/h |el = Third rail (750 volts DC) |map = }} The Taipei Metro Xiaobitan Branch Line is a high-capacity, elevated branch line of the Xindian (Sindian) Line (Green Line). Although it is a high-capacity line, only 1 train set (3 cars) is currently being used. The station itself is built inside the Xindian Depot. The branch line is long and has two stations. ==History== *September 24, 2004: Xiaobitan Line opens for free trials. *September 29, 2004: Xiaobitan Line begins revenue service. *July 22, 2006: A three-car train set built especially for the Xiaobitan Branch Line begins operations. *October 6, 2007: Due to strong winds from Hurricane Krosa, service was temporarily suspended from 3:30 PM. When the line first opened, some people complained about noise problems. Thus, sound-muffling walls were built along the tracks coming into the station. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Xiaobitan Branch Line (Taipei Metro)」の詳細全文を読む スポンサード リンク
|